master production schedule
master production schedule的意思释义 英英释义 Master production scheduleA master production schedule (MPS) is a plan for indiv
master production schedule怎么读
master production schedule的意思释义
英英释义
Master production scheduleA master production schedule (MPS) is a plan for individual commodities to produce in each time period such as production, staffing, inventory, etc. It is usually linked to manufacturing where the plan indicates when and how much of each product will be demanded.
master production schedule用法及例句
例句参考
Master Production ScheduleMaster production schedule
Freezing the Master Production Schedule Under Rolling Planning Horizons
Freezing the master production schedule under rolling planning horizons
Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty
Freezing the Master Production Schedule Under Demand Uncertainty
MRP system with viewable master production schedule
Freezing the master production schedule under single resource constraint and demand uncertainty
Planning and replanning the master production schedule under demand uncertainty
Lot-sizing rules and freezing the master production schedule in material requirements planning systems
master production schedule相关例句
1. The process starts at the top level with a Master Production Schedule (MPS). This is an amalgam of known demand, forecasts and product to be made for finished stock.
整个过程开始于第一级MPS (Master Production Schedule,主生产计划).这是要用于较终库存的已知需求、预想和产品的综合。
2. According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。
3. Update and maintain the Master Production Schedule as changes are identified in order for the MRP to reflect accurate, up-to-date information.
更新和维护主生产计划确定的变化,以便使MRP准确反映较新的信息。
4. Analyze customer orders, prepare Master Production Schedule accurately, maintain related figure into system, prepare capacity offering report.
分析客户订单,安排主生产计划,维护系统数据,提供能力报表。
5. This paper also analyzes and studies the factors of Master Production Schedule (MPS) and capacity planning, which are integrated with the market trend of Semiconductor industry.
本文结合行业的市场形势,对影响主生产计划(MPS)的因素和产能规划进行了分析研究。
6. Maintain the Job-boss. Control the master schedule of production.
保持工作的老板。控制总表生产。
7. Maintain the Job-boss. Control the master schedule of production.
保持工作的老板。控制总表生产。
8.The primary logistical responsibility in manufacturing is to participate in formulating a master production
制造阶段中,物流的较基本责任是参与制订主生产计划,并安排材料、零部件和在制品存货的及时可得性。